Toka Tindung Gold Project

Bankable Feasibility Study and Process Design METS was involved in the creation of a financial model, metallurgical testwork, sourcing and preparation for dismantling, transportation, re-assembly of a second-hand plant and planning for the construction of a power station at the project. Our key initiatives also included the carbon stripping circuit, cyanide destruction circuit and tailings […]

Continue Reading

Sungun Copper Project

Engineering Design and Commissioning METS was commissioned to expand a concentrator to treat 9Mtpa of copper ore (having a grade of 0.75%) to produce copper concentrate. The role included the basic design, generation of flowsheets, equipment lists, mass balances and process design criteria to permit the design and commissioning phases. METS were initially approached by […]

Continue Reading

Roy Hill Iron Ore Project

Engineering Design Verification This project required METS to review the existing design for the Roy Hill project. This review would identify issues with equipment arrangement and sizing that would prevent the required production rate of 55 Mtpa of iron ore concentrate. The review and recommendations covered the design of the beneficiation plant, rail transport and […]

Continue Reading

Peak Gold Mines

Customised Training Course METS presented a customised training course with selected modules from our Metallurgy for Non-Metallurgists course combined with operational information from the Peak Gold Mines. The course was delivered to a total of 17 Peak Gold Mines’ employees with varying degrees of experience in plant operations. At METS we understand that each business […]

Continue Reading

Mineral Separation and Screening

Customised Training Course The WA State Manager of Elastomers Australia saw a requirement for his local Perth as well as Melbourne based staff members to undertake training in Mineral Separation and Screening to improve their understanding of the metallurgical language, industry phases and physical and chemical principles of mineral separation for 10 of their staff. […]

Continue Reading

Mina Sertão

Engineering Design Commissioning This project required METS to engage in the concept of minimal engineering, i.e. project management of a group of sub-consultants to execute the project did result in substantial savings in time and money. This involved due diligence, metallurgical and engineering design, project management and reconstruction. The contracting strategy used by Troy Resources […]

Continue Reading

Marillana Iron Ore Project

Front End Engineering Design METS was involved in the FEED Stage to identify areas from the Definitive Feasibility Study (DFS) that had risk associated which impacted plant utillisation, operability, efficiency of beneficiation and providing solutions to overcome these obstacles while ultimately achieving a final costing before execution. METS used their expert knowledge and expertise to […]

Continue Reading

Karouni Gold Project

Metallurgical Testwork This project required METS to review the testwork previously conducted as well as the availability of drill cores for a further testwork program. Using this review, we designed a testplan to determine design parameters for the Karouni Gold Project plant. To maintain the project timeline, the testwork program schedule was discussed and reviewed […]

Continue Reading

Karouni Gold Project

Engineering Design – Comminution Simulation This project required METS to investigate the appropriateness of second hand milling equipment for the Karouni Gold Project. The investigation looked at multiple throughput scenarios and provided a breakdown of cost-related requirements relating to each processing arrangement. The simulation process allowed for an informed decision to be made by the […]

Continue Reading